Project team
- UNEX Systems
- HAMR Homes
Product Suppliers
Face-fixed framed glass balustrades built for salt air and coastal wind, without giving up the ocean view.
The Kaireka Holiday Home at Opito Sands, built by HAMR Homes with Whiti Design, is a two-level retreat on the Coromandel coastline with cedar and Hardie Stria cladding, four bedrooms, and high-end interior finishes. The exposed site called for balustrades that could handle wind and salt air without compromising the view, so NZ Windows Whitianga, an authorised UNEX fabricator, specified the UNEX Siena Framed Glass Balustrade. Clear toughened glass and powder-coated aluminium framing gave the strength needed for marine conditions, and a face-fixed installation kept the footprint minimal. The build hit early setbacks from severe weather and a temporary road closure, but NZ Windows Whitianga managed the fabrication, PS1s, and site-specific adjustments to deliver a fully compliant, on-design result just weeks behind schedule.
- Completed
- 2025
Like this Project?
Hire UNEX Systems
The products behind the project
One product specified into this build from one supplier, a verified ArchiPro member. Tap through to specifications, suppliers and lead times.
Professionals used in
this project
The practices and trades credited on this project.
More projects from
UNEX Systems
Other work by UNEX Systems, across every category they build in.
More in
Luxury Homes
Everything else in Luxury Homes, from every practice on ArchiPro.
Next Project
Keep scrolling
























