Skip to main content

St Cuthberts Pool Complex

St Cuthberts Pool Complex

Thermosash

Thermosash logo
  • 269.8K profile views
  • 29 saves
Visit Website
City: Auckland Architect: Architectus Construction Company: Dominion Construction Completed: 2014 This project specified our PW1000 suite double glazed to manage the high humidity and potential for condensation to occur on the aluminium or glass surface. Read more
Visit Website

St Cuthberts School Centennial Pool Complex featuring advanced PW1000 double glazing and heavy-duty sliding doors, designed to manage humidity and enhance thermal performance, completed in 2014 by Architectus and Dominion Construction.

City: Auckland
Architect: Architectus
Construction Company: Dominion Construction
Completed: 2014

This project specified our PW1000 suite double glazed to manage the high humidity and potential for condensation to occur on the aluminium or glass surface. The Thermosash PW1000 suite performs exceptionally well with pool complexes due to its exceptional limited thermal transfer properties.

The project also includes 10 sliding stacking doors each 3500 H x 2500 W with a weight of approx 350kgs each - these slide easily opening one whole side of the building.

Also in our scope was the curtainwall to the entrances, channel glazed glass to the gymnasium, all commercial 40mm windows, mechanical ventilated doors and the ventilated air grilles to the perimeter windows (Sunblade Louvre Solutions).
 

Products / Systems
PW1000 4 sided flush glazed unitised
Double Glazing - Commercial
Commercial Window Suite 40mm (Heavy Duty)
Heavy Duty Sliding Doors

1.2K0h 18m

Like this Project?
Hire Thermosash

The products behind the project

One product specified into this build from one supplier, a verified ArchiPro member. Tap through to specifications, suppliers and lead times.

Professionals used in
this project

The practices and trades credited on this project.

Next Project

Keep scrolling
BNZ Place - Wellington